LED Wall Rental for Exhibition Booths in Korea: COEX, KINTEX and What to Prepare

An LED wall is the fastest way to make a booth visible from across the hall. Here is what overseas exhibitors need to prepare so the wall is approved, powered and running when the doors open.

· comp1

Trade shows at COEX in Seoul and KINTEX in Goyang draw exhibitors from across Asia, Europe and North America. For an overseas exhibitor, an LED video wall is the most effective booth element and also the one with the most paperwork. This post explains how LED walls are typically handled inside Korean exhibition booths and what to prepare, based on how we run them for our own clients.

Tick what applies to your booth and a summary appears at the end, ready to send with your inquiry.

1. Check the organiser's rules first

Every show publishes an exhibitor manual with limits on booth height, hanging structures, sound levels and sometimes screen brightness facing neighbouring booths. Rules differ between shows and between the two venues, and they change year to year, so we do not generalise them here.

Send us the manual, or the show name and your booth number, and we will design the wall to fit the rules rather than discover a problem during inspection.

2. Structure: ground-supported walls are the default

Inside a booth, LED walls are usually ground-supported and integrated into the booth structure built by your stand contractor. Hanging from the hall ceiling is possible at some shows but requires organiser approval and rigging through the venue, which adds cost and lead time.

StructureApproval and lead timeFits
Ground-supportedUsually none beyond booth height. Short lead time.Most booths, back walls, product walls
Hanging from ceilingOrganiser and venue rigging approval. Weeks, with extra cost.Island booths that must be seen from far away

Your booth

3. Power is ordered through the organiser

Exhibition halls in Korea supply power to each booth through the organiser's official contractor, ordered in advance on the exhibitor forms. We tell you the exact power requirement for the configured wall so you can order the right supply by the deadline.

Ordering too little power, or ordering it late, is the most common reason a wall is not running on the morning of day one.

4. Brightness and pitch inside a hall

Exhibition halls are bright, but not as bright as daylight, so indoor panels are the right choice. Visitors view a booth wall from anywhere between 2 and 15 m, which makes P2.6 to P3.9 the usual pitch range. Go finer only for a product-detail wall that people approach closely. We calibrate brightness so the wall reads clearly across the aisle without washing out your own booth lighting.

5. Content: build a loop, not a presentation

A booth wall runs for eight hours a day, typically without an operator. Prepare a content loop of a few minutes: brand film, product demonstrations, key figures, and a quiet holding visual. Confirm the wall's exact pixel resolution with us before design starts, and send files in the agreed codec a few days before load-in so we can test them on the actual processor.

Content plan

6. Schedule: load-in, show days, strike

  1. Exhibitor manualRules, deadlines, power forms
  2. Wall designSize, pitch, structure agreed with your stand builder
  3. Power orderSubmitted by the organiser's deadline
  4. Content specsResolution and codec to your designers
  5. Booth buildStructure up, one or two days before opening
  6. Wall installInstalled and tested before graphics are finished
  7. Show daysLoop running, remote check-ins
  8. StrikeSame evening the show closes, on the venue's deadline
We coordinate directly with your stand contractor so the wall is installed and signed off within the build window, and removed on time without blocking their crew.

What to send us

ItemWhy we need itHave it
Show and boothShow name, venue (COEX, KINTEX or other), dates, booth number
Booth drawingBooth size and a drawing or sketch from your stand contractor
Wall sizeDesired wall size or the wall area in the booth design
Content planLoop only, or live inputs and interactive elements
Contractor contactYour stand contractor, so we can align build and strike times

Your booth summary

Tick items above and they are collected here.

Start an inquiry with this →

The button opens the inquiry form with this summary pre-filled in the message field. You can edit it before sending; nothing is sent until you submit.

We will come back within one business day. For a broader overview of renting LED in Korea, see our guide for overseas event teams and the LED rental service page.

Start a project →
2026-11-18Preparing a Media Art Exhibition in Korea: 7 Steps from Site Survey to StrikePlanning a media art or brand exhibition in Korea? A step-by-step guide to site surveys, artwork specifications, LED and projection equipment, pre-tests, installation and calibration, daily operation, strike and documentation.2026-11-13LED Screen Rental in Seoul: A Practical Guide for Overseas Event TeamsPlanning a conference, launch or concert in Korea from abroad? What to know about renting LED screens and LED walls in Seoul: venues, power, pixel pitch, timelines, content specs and what to send for a quote.
All posts
comp1 · CEO Taeseok Lee · Business Reg. No. 288-33-01801
905, 9F, 114 Seonyu-ro, Yeongdeungpo-gu, Seoul, Korea · +82-507-1324-1220 · [email protected]
Instagram Naver Blog RSS Privacy Policy © 2026 comp 1 — All rights reserved

Copyright of this content belongs to its respective owners or providers. Unauthorized use may result in legal liability under copyright law.