Preparing a Media Art Exhibition in Korea: 7 Steps from Site Survey to Strike

A media exhibition only opens when the space, equipment, installation and daily operation all line up on the same schedule. Here is what to decide first, step by step, from the first site visit to the last day of strike.

· comp1

A media exhibition does not open just because the artwork is finished. Someone has to know how big the projection wall really is, how much power the room can supply, how much daylight comes in, and who switches everything on every morning. Artists focus on the work and venues focus on safety and schedules, so the technical work in between is easy to leave unassigned. This guide walks through how a media art or brand exhibition is prepared in Korea, from the first site visit to the day the walls are restored.

Tick the items that apply as you read. They are collected at the end so you can send them straight to us with your enquiry.

1. Site survey: the room before the drawings

Preparation starts with seeing the space in person. Walls on a floor plan turn out to be blocked by columns, ceilings have no rigging points, and loading doors are too narrow for large equipment more often than you would expect. A survey should cover at least the following.

  • Measurements: the real size of each wall and floor area, ceiling height, and the position of columns and doors
  • Power: available capacity and where the outlets and distribution boards are. Larger set-ups may need additional power work
  • Light: windows, skylights and house lighting. Ambient light washes out projected images
  • Access and fixing: the load-in route and lift size, and whether walls and ceilings may be drilled or anchored
  • Sound and network: sound bleed into neighbouring rooms, and an internet line for remote monitoring
Museums and galleries in Korea often have their own rules on drilling, floor loading and permitted working hours. Checking them with the facility manager during the survey keeps the installation schedule realistic.

Venue

2. Artwork specs: content and equipment are decided together

A media work can only be finished properly once the playback equipment is known, and the equipment can only be chosen once the work's specifications are known. The two have to be planned together from the start. Agree on these with the artist or production team first.

  • Resolution and aspect ratio: render to the actual pixel size of the screen or projection surface so nothing is cropped or stretched
  • Length and looping: a seamless loop, or screenings that start at set times
  • Multi-screen sync: whether several screens must play in exact sync as one piece
  • Sound: room-wide speakers, or headphones and directional speakers heard only in front of the work
  • Interaction: whether the work responds to visitors. Sensors and real-time graphics hardware are then added

Artwork

3. Equipment: display, playback and sound

With the work and the space defined, the equipment can be chosen. The first decision is how the image will be shown.

OptionWorks well forWatch out for
LED displayBright rooms, crisp images, screens with visitors walking close byViewing distance versus pixel pitch, structure and power
ProjectionImmersive rooms, large surfaces, floors, curved or sculptural surfacesAmbient light, visitor shadows, alignment when several projectors are combined
MonitorsSmall works, explanatory video, kiosksBezels and how they sit in the exhibition design

Then playback. A single looping video can run on a simple player, but synchronised multi-screen works and blended projection usually need a media server running software such as Resolume, Millumin or TouchDesigner, or a dedicated media server. Interactive works add sensors and a computer for real-time graphics.

Think about daily operation when choosing equipment: whether it can switch on and off on a schedule, and whether it can be checked remotely, makes a large difference to running costs over the exhibition period.

4. Drawings and pre-tests: play it before load-in

Once the equipment is decided, we draw the layout and cabling plan: screen and projector positions, throw distances and angles, where equipment is hidden, cable routes and the visitor flow, all on one sheet.

Where possible, the work is then played on the actual equipment before going on site. Checking that the files play without stutter at full resolution, that multiple screens stay in sync and that the loop point does not flicker shortens the installation and avoids last-minute problems.

The most common pre-test problems are codecs and resolution. Rather than sending only the final master, send a short test clip first so it can be checked on the playback hardware.

5. Installation: hang, connect, calibrate

Installation usually runs from load-in to fixing structures and equipment, power and signal cabling, display calibration and finally artwork set-up. The last two stages take longer than most people expect.

  • Colour and brightness: matching several screens or projectors so they read as one work
  • Projector alignment: blending the overlaps so no seams show, and mapping the image onto walls or objects
  • Room lighting: setting house light to the level where the work looks best while keeping routes safe
  • Tidy cabling: no exposed equipment or cables that visitors could trip over or touch
Build time into the schedule for the artist's final review. Seeing a work at full scale in the room for the first time often leads to changes in colour, brightness and volume.

Schedule

6. Operation: the same show every day

Once the exhibition is open, the job is to make every day look like opening day. Equipment needs to switch on at the right time with the work starting from the beginning, nothing should have frozen overnight, and consumables such as projector lamps and filters need checking.

  • Scheduled start-up and shut-down matched to opening hours
  • Remote monitoring so the system can be checked and simple faults restarted without a site visit
  • A one-page manual for venue staff: how to switch on and off, and what to do if something stops
  • Spares and contacts: spare cables and parts on site, and a named person to call

Operation

7. Strike and archive: plan the end too

Strike is installation in reverse, but often with less time. Venues with back-to-back exhibitions set short strike windows, and drilled holes and paintwork have to be restored. Agree the strike schedule and the scope of restoration when the contract is signed.

Before strike, record the exhibition. Moving-image work rarely comes across in a single photograph, so video documentation of the work running in the space is worth having for portfolios, funding applications and touring proposals.

Your exhibition

What you have ticked

Tick items above and they will be listed here.

Send this with an enquiry →

The button copies this list into the message field of our enquiry form. You can edit it before sending, and nothing is sent until you submit the form.

At comp1, one project manager stays with the exhibition from the site survey through equipment, installation, daily operation and strike, and we work in English. It is fine if the artwork or venue is not settled yet: tell us the type of exhibition, the city and venue if known, and the dates, and we will come back within one business day. See our media exhibition service page, and if you are also showing at a trade fair, our guide to LED walls for exhibition booths at COEX and KINTEX.

Start a project →
2026-11-13LED Wall Rental for Exhibition Booths in Korea: COEX, KINTEX and What to PrepareExhibiting at a trade show in Korea? How LED video walls work inside booths at COEX and KINTEX: height and rigging rules, floor loading, power ordering, brightness, content loops and strike schedules.2026-11-13LED Screen Rental in Seoul: A Practical Guide for Overseas Event TeamsPlanning a conference, launch or concert in Korea from abroad? What to know about renting LED screens and LED walls in Seoul: venues, power, pixel pitch, timelines, content specs and what to send for a quote.
All posts
comp1 · CEO Taeseok Lee · Business Reg. No. 288-33-01801
905, 9F, 114 Seonyu-ro, Yeongdeungpo-gu, Seoul, Korea · +82-507-1324-1220 · [email protected]
Instagram Naver Blog RSS Privacy Policy © 2026 comp 1 — All rights reserved

Copyright of this content belongs to its respective owners or providers. Unauthorized use may result in legal liability under copyright law.